SP1.1 Commitment Letter confirming that the conceptual architectural design will not undergo major changes that would affect the structural design (or) final architectural design drawings
SP1.2 Code of Practice and Design Reference
SP1.3 Method of Statement of Pile Load Test
SP1.4 Material Properties
SP1.5 Pile Design Report by Foundation Designer (Geotechnical and Structural Design)
SP1.6 Geotechnical Report (should consist adequate c, phi, and SPT value for pile design calculation) and Bore Hole Profile
SP1.7 Site Location Plan with Adjacent Building and Boreholes
SP1.8 Columns Loading Calculation, Etabs Model, and Stability Checking
SP1.9 Piling Plan with Test Pile Locations
SP1.10 Test Pile Details (Anchor pile details if anchor method)
SP2 Submission Set (M2)
Subtitle
Principles
SP2.1 Signatures
No principles available
Subtitle
Principles
SP2.2 Document Sets
No principles available
Deep Excavation
SE1 Design Report
Subtitle
Principles
SE1 Design Report
No principles available
SE2 Submission Set
Subtitle
Principles
SE2.1 Signatures
No principles available
Subtitle
Principles
SE2.2 Document Sets
No principles available
CONCEPTUAL
A1. Urban Planning
Subtitle
Principles
1.Location Map
A1.1.1 North Point
A1.1.2 Surrounding Roads and Nearest Junctions
A1.1.3 Surrounding Environment with Important Cultural & Heritage Elements
No recommendations available for this discipline.
No recommendations available for this discipline.
No recommendations available for this discipline.
WATER SUPPLY AND SANITATION
W1 Design Report & Calculations
Subtitle
Principles
W1.1 Water Supply
W1.1.1 Source of Water Supply
W1.1.2 Cold & Hot Water Demand with Respect to Design PE
W1.1.3 Sizing of Groundwater Reservoir and Roof Tank Reservoir
W1.1.4 Water Treatment Plant (where used)
W1.1.4.1 Submit Result of Sample Analysis on Physical, Chemical & Bacteriological.
W1.1.4.2. Provide a flow sheet of treatment processes to remove the pollutant.
W1.1.4.3. Provide Necessary Calculation of Each Process.
W1.1.4.4. Provide references used in the design.
W1.1.5 Sizing of Transfer Pump and Transfer Pipe
W1.1.6 Head Loss Calculation at Critical Location
W1.1.7 Positioning of PRV
W1.1.8 Sizing of Booster for Boosting Pressure for Floors with Inadequate (Low) pressure
W1.1.9 Sizing of Water Meter
W1.1.10 Sizing of Hot Water Supply Facilities
Subtitle
Principles
W1.2 Sanitation
W1.2.1 Sizing of Soil Branch, Soil Stack, and Vent
W1.2.2 Sizing of Waste Branch, Waste Stack, and Vent
W1.2.3 Sizing of Drain Pipe
W1.2.4 Waste Water Treatment Plant/Waste Water Treatment System (with respect to the method used)
W1.2.4.1. Submit the characteristics of the raw sewage.
W1.2.4.2 Provide a flow sheet of the system used with a brief description of each process.
W1.2.4.3 Provide the Necessary Calculations of Each Process.